At 2159 hours on Saturday February 5th, Company 8 (Reynoldsville VFD), Engines 91 (Salem VFD), 71, and 51 (Mt. Clare VFD) along with HCES were alerted for a Structure Fire on Rising Bird Lane in Reynoldsville. Engine 71 staffed with 5 personnel responded in 3 minutes. Tanker 11 and Engine 112 (Spelter VFD) were added to the assignment. Engine 81 arrived on scene with a Working Fire in a single-story and placed (2) hand lines in service. Engine 71 arrived on scene as 3rd due and sent its manpower to assist with interior attack finding heavy fire thoughout and beneath the structure. Units on scene provided water and manpower for fire suppression with Tanker 11 shuttling water to the scene. After extensive overhaul, crews returned home at 0116 hours. No injuries were reported. Frigid Temperatures of 11 degrees and a frozen hydrant hampered efforts. Pictures courtesy of Co. 8.